Client
A group of three investors developing renewable energy assets in Far East.
Location
East Asia.
Summary
A group of three investors required technical reassurance for the fabrication and installation of a 376MW wind farm.
The Challenge
The group of three investors required an independent and experienced organisation to provide high level technical surveillance in corrosion protection during design, engineering, fabrication and installation of a 376MW offshore wind farm.
The solution
OGC Energy has a wealth of experience protecting the interest of operators and investors in the energy industry. OGC Energy provided the technical support to the
investment group in order by reviewing and verifying design, engineering and fabrication on their behalf with special attention to all corrosion protection aspects
including surface preparation and coating application as well as cathodic protection.
The Result
The investment group received all the required assurances and now can categorically demonstrate that the asset is fit for purpose.
Contact our team to receive technical support in materials and corrosion for your
project.
Email Us
US Toll-free
Oil and Gas Corrosion Ltd.
USA toll-free: 877-399-1010
UK: +44 (0) 114 4000850
email: office@ogcenergy.com