Successful field service? No documentation? What does NACE MR0175 require?
Criteria for Replacing Materials in Existing Fields
Introduction
The question of when to replace materials in an existing field is a critical one. While ISO 15156-1 Paragraph 8.2 provides some qualification criteria, it can be unclear how to proceed when materials have been in use without documented problems.
Documentation Requirements
According to the ISO 15156 Maintenance Panel, NACE MR0175/ISO 15156-1 Paragraphs 6.2, 8.1, 8.2, and 9.0 outline the documentation required for two years of successful field service. It is essential to note that documentation has always been necessary.
Clause 8.2
This inquiry relates to NACE MR0175/ISO 15156-1 Clause 8.2. If you need to qualify equipment based on field service but are unsure how to document it, please contact us at Oil & Gas Corrosion, and we can assist you.
Contact Us
If you require assistance with documenting the qualification of equipment based on field service, please contact us at OGC Energy. Our team of experts can help you navigate the requirements outlined in ISO 15156-1 and ensure that your equipment meets the necessary standards.