FAQ's

What are the NACE MR0175 traceability requirements?

Question:

Following ISO 15156-3 Section 7.2 Marking, labeling and documentation, it is indicated that material complying with ISO 15156 shall be made traceable. This section confirms that suitable documentation can ensure acceptable traceability without listing the documentation required. Could you please clarify what are the documents required to ensure acceptable traceability of material complying with ISO 15156?

Answer:

Required documents to ensure acceptable traceability shall be agreed with the equipment user.

This question is in relation to NACE MR0175/ISO 15156-3 Clause 7.2

Reference: ISO 15156 Maintenance Panel Inquiry #2014-10

[insert page=’mp2006-13′ display=’content’]

Talk to an expert

Get in touch with us